Residential Facilities

Santa Maria del Rosell General University Hospital in Cartagena

Project description

Photovoltaic installation for self-consumption of 444.175 kWp and 457 kWn of inverter.
The installation of 815 solar panels of 545Wp is carried out on the roof with a concrete and coplanar ballasted structure. With this installation, the Hospital expects a reduction in electricity consumption of 25% on its total consumption.

Project data

Installation date 07/27/2024
Installed power in panels 444.175 kWp (815 x 545Wp)
Installed power in Inverter: 457.00 kWn (12 inverters between 15kW and 50kW) Huawei brand.

Results